What is known

Velo3D’s November 19 release describes a copper-nickel program covering 12 builds, 33 geometries and 1,756 printing hours. Eleven builds succeeded first time; one required revised supports and another attempt. Reported hands-on simulation engineering fell from 4–40 hours to under one hour per build.

Our analysis

Agree the unit of comparison first

An additive-manufacturing build can contain several geometries. An individual part has its own acceptance criteria. Before discussing success rates, buyer and manufacturer need an agreed unit: a completed printing cycle, an item that passed dimensional inspection, or a finally accepted part. The successful-build count then has a defined meaning when discussing supplier obligations.

The next question is sample relevance. Which geometries resemble the intended order in material, dimensions and inspection requirements? How was the work selected, and what was excluded? A buyer benefits more from identifying a comparable group than from applying an overall metric to every product. The disclosed 12 builds open that discussion; a series-production decision requires agreed comparison boundaries.

Count accepted outcomes

Hands-on preparation time covers one part of the process. An accepted part’s cost includes preparation, machine use, material, inspection, correction and repeated work. If inspection or subsequent processing is the bottleneck, faster simulation may free an engineer while leaving the delivery schedule unchanged. These effects deserve separate measures: specialist time, order duration and expenditure on a usable item.

Our negotiation model divides the entire programme’s expenditure by the number of parts accepted against agreed criteria. Repeated attempts belong in the numerator; rejection affects the denominator. This allows two processes to be compared for the same requirement. It is a buyer’s evaluation framework, not a calculation published by Velo3D. Without underlying costs and acceptance data, we cannot calculate the cost of the parts in the release.

A pilot built around the buyer’s requirement

A useful next step is to select a small set of parts from an intended order and define the alternatives before testing. Material, outcome requirements and the boundaries of included operations need to match. Engineering preparation, computation, machine hours, inspection and corrections should be recorded separately. The team can then identify where an improvement occurs and where the constraint moves.

The corrected attempt deserves particular attention: who detected the support problem, which work had to be repeated and what did it cost? A comparable pilot should agree treatment of repeated work in advance. This helps establish whether correction is included in the supplier’s service or requires another customer decision. It also identifies the inputs and printing authorisation the buyer must provide.

Deciding whether to enter series production

After the pilot, the parties can discuss a specific change: less engineering effort, fewer reworks, improved accepted yield or earlier order completion. These support different pricing and production-planning decisions. When only one stage improves, its benefit should be compared with implementation cost and the readiness of the remaining participants. This is our proposed evaluation method; the editorial team has not tested PanX.

A small case has practical value when it discloses the scale of observation and a correction, rather than presenting production without exceptions. Buyers can use that information to formulate a comparable trial. A series-production decision then rests on the part of the process verified against their own requirement, with responsibility for repeated work and acceptance discussed alongside the manufacturing outcome.

Limits of the evidence

The editorial team has not tested PanX. These are supplier-reported results, without the underlying dataset or independent verification.

A build is not an individually accepted part; hands-on preparation time is not the full manufacturing cycle.

Primary sources